Terraria Mod Apk Download Latest Version For Android V.1.4.3.2.3

Terraria Mod Apk Download Latest Version For Android V.1.4.3.2.3

by 505 Games Srl
Download ( 137.84 MB)
Name Terraria Terraria is the most famous version in the Terraria series of publisher 505 Games Srl
Publisher 505 Games Srl
Genre Adventure
Size 137.84 MB
Version 1.4.3.2.3
Update Sep 30, 2022
MOD Mod menu
Report Report Apps
Rating
0 / 5 (0 vote)

DIG! FIGHT! EXPLORE! BUILD! Join the community of millions of Terrarians!

google.com, pub-9613184551808605, DIRECT, f08c47fec0942fa0

TERRARIA MOBILE REBUILT FROM THE GROUND UP – NEW AND IMPROVED 1.4.4 UPDATE INCLUDING LABOR OF LOVE CONTENT!

“This is the full version of Terraria, built from the ground up… If you loved it on PC or consoles, you’ll love it here.” – Slide To Play

The very world is at your fingertips as you fight for survival, fortune, and glory. Delve deep into cavernous expanses, seek out ever-greater foes to test your mettle in combat, or construct your own city – In the World of Terraria, the choice is yours!

We recommend at least 2GB of RAM and a device from 2014 or newer. We support devices running Android 5.0 with 1GB of RAM and compatible graphics, but these devices may experience reduced performance.

• MULTIPLAYER – Play with up to 7 friends on Local Wifi or Online via device-device Wifi hosted games or through the Mobile Terraria Dedicated Server for PC (available for free on Terraria.org)
• TERRARIA REIMAGINED FOR MOBILE – Fully customizable controls and User Interface provide a level of polish and capability not previously possible!
• Gamepad support – including fully-remappable buttons – Play with your Bluetooth connected gamepad where supported.
• Full array of World sizes – Small/Medium/Large…the same size as on Terraria for PC! Now includes random world name generator and the ability to use World Seeds (including some hidden easter egg worlds)
• Over 400 enemies to combat, defeat, and plunder for loot
• Over 20 Biomes and Mini-Biomes to explore, both above and underground – from lush forests to barren deserts to dungeons, the underworld, and even the terrifying Corruption await!
• Updated crafting with multiple added item options
• Over 20 NPCs to discover, each providing their own benefits and unique style
• In-depth building options that are easy to learn but allow for amazing feats of architecture in the hands of a master.
• And much, much more!

In short, every pixel of Terraria has been reimagined and hand crafted for the BEST possible mobile experience!
Follow us on Twitter @Terraria_Logic and @505_Games

Join our community on Discord @ http://Discord.GG/Terraria

Like us on Facebook at www.facebook.com/TerrariaOfficial and https://www.facebook.com/505Games

Visit us on the web at www.terraria.org

Join the official Terraria Forums at: https://forums.terraria.org/

Download Terraria Mod Apk Download Latest Version For Android V.1.4.3.2.3

Many bug fixes and improvements!

google.com, pub-9613184551808605, DIRECT, f08c47fec0942fa0

Download ( 137.84 MB )

You are now ready to download Terraria for free. Here are some notes:

  • Please check our installation guide.
  • To check the CPU and GPU of Android device, please use CPU-Z app

All Versions

Terraria Mod Apk Download Latest Version For Android V.1.4.3.2.3
Terraria 1.4.3.2.3 MOD
Oct 21, 2022 137.84 MB

What's Mod:

Mod menu
Terraria APK v1.4.3.2.3  MOD God Mode, Unlimited Items
Terraria 1.4.3.2.3 MOD
Jun 22, 2022 n/a

What's Mod:

God Mode, Unlimited Items

More by 505 Games Srl

Recommended for you

Similar Games

×